- AustraliaEnglish
- BelgiumDutchFrench
- BrasilPortuguese
- BulgariaBulgarian
- CanadaEnglish
- Greater ChinaSimplified ChineseTraditional Chinese
- CzechCzech
- FinlandFinnish
- FranceFrench
- Germany (Global)GermanEnglishFrenchSpanish
- GreeceGreek
- HungaryHungarian
- IndiaEnglish
- ItalyItalian
- IrelandEnglish
- JapanJapanese
- IsraelHebrew
- KoreaKorean
- LuxembourgFrench
- MalaysiaMalaysian
- MexicoSpanish
- Middle East & AfricaEnglish
- NetherlandsDutch
- PolandPolish
- PortugalPortuguese
- RomaniaRomanian
- SlovakiaCzech
- SpainSpanish
- South AmericaSpanish
- South AsiaEnglish
- South East AsiaEnglish
- SwedenSwedish
- ThailandThai
- TurkeyTurkish
- UkraineUkrainian
- United KingdomEnglish
- United States of AmericaEnglish
![](https://cdn.sma.de/fileadmin/_processed_/4/2/csm_Tegnatia-Utility-Teksin_1170x451_442ed100e1.jpg)
Teksin GES 40 MWp
Utility-scale PV Power Plant – Karaman, 2020
Karaman, Teksin Solar Power Plant has been completed by Tegnatia A.Ş., thus Teksin SPP is the largest 40 MWp licensed solar project so far installed in Turkey. The Sunny Central 4400 central inverters have been used for this project with 1,500 Volt technology and have the "Storage-Ready" function for easy connection for storage battery. SMA supported the project from design period and construction period till commissioning. These are becoming increasingly important to the further integration of high shares of renewable energy into the power grids worldwide.
We would like to thank to our client Tegnatia A.Ş. and investor of the project Teksin Enerji San. ve Tic. A.Ş for choosing SMA products in their project. The project will prevent carbon emmision 29700 tons yearly for a green environment.
![](https://cdn.sma.de/fileadmin/_processed_/c/0/csm_Tegnatia-Utility-Teksin_600x450_e438c96b37.jpg)
Lokasyon
Karaman
Devreye alma
2020
Nominal kurulu güç
40 MWp
Yıllık üretim
66 GWh
Engellenen CO2
29700 ton/yıllık